Lean mass/cutting steroid cycle

Lean Mass/Cutting Steroid Cycle

week
of
cycle
Masteron Primobolan Depot
1
200 mg
200 mg
2
200 mg
200 mg
3
200 mg
200 mg
4
300 mg
300 mg
5
300 mg
300 mg
6
300 mg
300 mg
7
300 mg
300 mg
8
200 mg
200 mg

Nolvadex is taken, 10 mg per day, every day, for all cycles.

3 tabs/day means 3 tablets taken per day, 1 in the morning, noon and night. When 2 amps/week is outlined, both can be put in one syringe, or taken 1 amp per shot on separate days during the week.

Cholesterol Support: Lipid Stabil (3 capsules/day) and Fish Oil (4 g/day)

Products needed for Lean Mass/Cutting steroid cycle:

  • 2000 mg of Primobolan Depot (Methenolone Enanthate)
  • 2000 mg of Masteron (Drostanolone Propionate)

Leave a Reply

Your email address will not be published. Required fields are marked *